Fairgrounds Nashville Improvement Project Update: The Week in Review: May 27-31

June 4, 2019

Construction Update

  • Steel erection in the Show Arena is finished and roof installation has begun.
  • Gutter installation is ongoing at all buildings.
  • Air turnover units are being installed in Expo 1.
  • Construction of concrete masonry unit walls continues in the Expo 2 bathrooms.
  • Drywall is being hung in Expos 1 and 3.
  • Footings for concrete are being excavated for the loading dock and excavation for base foundations at loading docks and ramps have started.